full backup missing in incremental

Here you can write your Problems with Backups.

Moderator: sepma

Post Reply
jvdm
Posts: 1
Joined: April 29th, 2009, 3:00 pm

full backup missing in incremental

Post by jvdm » April 29th, 2009, 3:14 pm

I have several remote locations with small bandwidth. I do the backup with the type 'incremental'. Some of the backups show the date of the last full backup. Because the first INC should always be a full backup, this is correct. But some of the backups don't show the last backup. When I want to restore something, it says that there has been no full backup. How can I force the job to redo a full backup to correct this problem?

B.T.W.: all backup clients are in one group and I don't want to force a full backup job on all clients.

Jan.

ossi1001
Posts: 77
Joined: May 15th, 2009, 10:41 am

Re: full backup missing in incremental

Post by ossi1001 » May 15th, 2009, 11:04 am

Hello,

perhaps you erased the medium, which contained some full-backups. Select one of the affected clients in Job State > Backups choose the oldest date, which is possible. One of the colums is called Type. Here you should see the letter F.

If you don't see a backup with the letter F, you have to start a backup manually.
Otherwise send a mail to support@sep.de.

If you don't have a contract with SEP, perhaps you don't get help.

Greetings

Post Reply